You are here: Home > Hydronic Heater Replacement Parts > Lochinvar Hydronic Heater Parts > Crest
Choose a sub category:
FB 1500 FB 2000 FB 2500 FB 3000
FB 3500
Lochinvar Crest 1500-3500

The Fire Tube Innovation up to 5.0 Million BTU's
Lochinvar Crest is a modulating condensing boiler with fire-tube technology.  It's a fully modulating-condensing boiler.  This commercial boiler comes in sizes that range from 1.5 to 5.0 million Btu/hr.
The Lochinvar leading-edge technology will save money in the largest applications.

The Crest performs with thermal efficiencies up to 99% in low water temperature applications
The advanced combustion system with a unique burner design with up to 25:1
turn-down. 

We stock many of the parts for Lochinvar Crest.  Parts4heating will provide any part you may require but if we do not have it in stock, Lochinvar reacts very quickly and ships within 24 hours for many of their items.

Click on this picture below to find your parts





Crest Manual


(Acrobat Reader Required)
Sort By:
Page of 1
Lochinvar GKT2050 GASKET, GAS TRAIN, ALL Lochinvar GKT2050 , 100146470 GASKET, GAS TRAIN, ALL

Lochinvar GKT2050 GASKET, GAS TRAIN, ALL

Our Price: $2.52
Lochinvar TRF20000 TRANSFORMER, AW151-701 Lochinvar TRF20000 , 100170172 TRANSFORMER, AW151-701

120/24 Volt 40 VA TRANSFORMER, AW151-701

Our Price: $35.28
Lochinvar FAN3719 FAN REPLACEMENT ASSEMBLY, PB/PF1501-2001 Lochinvar FAN3719 , 100145022 FAN REPLACEMENT ASSEMBLY, PB/PF1501-2001

Lochinvar FAN3719 FAN REPLACEMENT ASSEMBLY, PB/PF1501-2001

Our Price: $4,324.32
Lochinvar RLY20082 INTEGRATED CONTROL, FB3000 & 3500 Lochinvar RLY20082 , 100167592 INTEGRATED CONTROL, FB3000 & 3500

Lochinvar RLY20082 INTEGRATED CONTROL, FB3000 & 3500

Our Price: $1,105.02
   
 
Fully Modulating up to 25:1 Turndown:

25:1 turndown means the burner can fire at a rate as low as 4% of its maximum input. For example, a 2 million Btu/hr CREST unit can modulate from 80,000 up to 2,000,000 Btu/hr depending on demand. High turndown greatly reduces “short cycling” when demand is low. All boiler systems are designed to provide enough heat to maintain a facility’s heat loss on the coldest days. When the system is zoned, the CREST’s high turndown works to match the actual system demand and, in return, reduces the customer’s fuel bill and provides better comfort by load matching the heat loss of the system. Greater seasonal efficiencies will be realized due to the extremely large turndown offered by CREST.

FBN-04 (Replaces FBN-03 8/12)
(Web Update 12/12) FG-7.5M-8/12 ©-Printed in U.S.A.